North Grove Park Development

Work generally includes asphalt paving, asphalt color coat, concrete paving, concrete sloped entry, sloped entry with curb, crushed limestone trail, integral curb at walk, curb at playground, engineered wood fiber, playground equipment, picnic shelter, bench, picnic table, game table, playground underdrainage, drain cleanout, mitered drain, shade trees, evergreen trees, native seed mix, and lawn restoration.
Bid Form (click to expand/collapse)
Bid Set - Specifications (click to expand/collapse)