North Grove Park Development

Work generally includes asphalt paving, asphalt color coat, concrete paving, concrete sloped entry, sloped entry with curb, crushed limestone trail, integral curb at walk, curb at playground, engineered wood fiber, playground equipment, picnic shelter, bench, picnic table, game table, playground underdrainage, drain cleanout, mitered drain, shade trees, evergreen trees, native seed mix, and lawn restoration.
Addendum No. 1 (click to expand/collapse)
Order files below for $0.00 each
Name Size
2024_12_17 Addenda 1 1317 North Grove Park - 625.5 KB