Palma Lane Park Development
Work generally includes asphalt paving, asphalt color coat, concrete paving, concrete sloped entry, curb at walk, curb at playground, engineered wood fiber, chainlink fence, playground equipment, picnic shelter, bench, picnic table, playground underdrainage, drain cleanout, landscape boulders, shade trees, ornamental trees, shrubs, seeding, and lawn restoration.
Bid Form
(click to expand/collapse)
Name | Size | ||
2024_10_31 Palma Lane Park OSLAD Development 1257-Bid Form | 123.2 KB |
Bid Set - Specs
(click to expand/collapse)
Name | Size | ||
2024_10_31 Palma Lane Park OSLAD Development 1257-Specs | 5.7 MB |
Contractor Compliance Form
(click to expand/collapse)
Contractor References
(click to expand/collapse)
Name | Size | ||
2024_10_31 Palma Lane Park OSLAD Development 1257-Contractor References | 115.4 KB |
Substance Abuse
(click to expand/collapse)
Name | Size | ||
2024_10_31 Palma Lane Park OSLAD Development 1257-Substance Abuse | 119.6 KB |