Palma Lane Park Development
Work generally includes asphalt paving, asphalt color coat, concrete paving, concrete sloped entry, curb at walk, curb at playground, engineered wood fiber, chainlink fence, playground equipment, picnic shelter, bench, picnic table, playground underdrainage, drain cleanout, landscape boulders, shade trees, ornamental trees, shrubs, seeding, and lawn restoration.
Addendum No. 1
(click to expand/collapse)
Name | Size | |||
2024_11_26 Addendum 1-Palma Lane Park Development | 151.2 KB |