Sunrise Park OSLAD Development

Work generally includes concrete paving and curb, asphalt paving, engineered wood fiber surfacing, basketball court, pump track, playground equipment installation, shelter installation, site furniture installation, interpretive signage, playground underdrainage, drain cleanout, mitered drain, rain garden seed mix, lowland pollinator seed mix, and lawn restoration.
Bid Set - Drawings (click to expand/collapse)
Name Size
1266 Sunrise Park - CD Set 21.3 MB