Bird Park OSLAD Grant & DCEO Grant Development

The scope of work for the Project generally includes asphalt paving, concrete paving, playground equipment, engineered wood fiber surfacing and drainage, splash pad equipment and water assembly, water meter, site furniture, landscaping, and lawn restoration.
Bid Set - Drawings (click to expand/collapse)
Name Size
1247-Bird Park- IFB-PLANS 26.4 MB