Central Park Phase 2 Development Rebid

Erosion and Sedimentation Control installation, maintenance, removal, and restoration of silt fence and erosion control elements including stabilized construction entrance.

Status

Bidding Closed

Prebid Date7/11/24 2:00pm

Bid Date7/19/24 10:00am

Company & Contacts

Planning Resources
Steven Halberg  

Location

Wood Dale, Illinois 60191

1. The Owner is accepting proposals for the Site Improvements at Central Park, Wood

Dale, Illinois.

2. The work will consist of the following:

2.1. Erosion and Sedimentation Control installation, maintenance, removal, and

restoration of silt fence and erosion control elements including stabilized

construction entrance.

2.1.1. Compliance with City of Wood Dale permit requirements.

2.2. Site Construction Security Fencing

2.3. Stabilized construction entrance installation, maintenance, removal, and

restoration

2.4. Construction Staking and Layout

2.5. Site Grading, stripping existing topsoil and stockpile, rough grading, placement

and compaction, topsoil respread from stockpile.

2.6. Concrete Walks and miscellaneous flatwork

2.7. Installation of Owner furnished:

2.7.1. Fabric Shade Shelter

2.8. Coordination with all trades for Owner furnished equipment and amenities:

2.9. Furnish and install storm sewer and underdrains and associated structures.

2.10. Furnish and install concrete, barrier curbing, walks, paths, and miscellaneous flat

work.

2.11. Furnish and install vinyl fencing.

2.12. Coordinate installation of poured-in-place rubber resilient surface Creative Play

area, which will be under separate contract with the WDPD.

2.13. Turf restoration – seeding, fertilizing, and erosion control blanket.

2.14. Miscellaneous construction for a complete project as described in the plans and

specifications.